Pre-commit Rollout
Design and stage repository pre-commit checks that preserve partial staging, meet a latency budget, mirror mandatory CI controls, and recover cleanly when setup fails.
dolven
Updated Jul 24, 2026
Turn Azure billing evidence into a prioritized cost reduction plan with explicit confidence, risk, ownership, rollback, and verification.
A cloud bill can show where money went without proving why it changed or what is safe to cut. This skill starts by reconciling the supplied Azure cost data, naming the cost basis and coverage, and keeping observed spend separate from inferred causes and estimated savings.
The review maps the bill, challenges Advisor or team recommendations, and sorts actions into waste removal, usage tuning, capacity changes, and commitments. Each priority carries evidence confidence, affected cost, operational risk, owner, dependency, rollback, and a way to verify both service health and realized savings. The package includes a local CSV and Cost Management JSON summarizer, a review rubric, and a decision-ready report template.
Use it after a cost spike, before approving a rightsizing or reservation proposal, or when a FinOps backlog needs a defensible order. It does not change Azure resources, invent current prices or utilization, or count forecast savings as money already saved.
Input
Review this June and July Azure Cost Management export. Total spend rose from $18,200 to $24,900 after a release. Separate what the export proves from what still needs resource, usage, or deployment evidence, then choose the next three checks.
Output
A reconciled period comparison with absolute and percentage changes, top contributors, new and unallocated spend, evidence-state labels, plausible causes kept separate from verified ones, and three bounded checks tied to the cost and release evidence.
Input
Azure Advisor says these 14 production VMs could save $3,800 per month by downsizing. We have 14 days of average CPU, no memory data, and a 99.9% availability target. Review the proposal and tell us what can be approved now.
Provide an Azure Cost Management CSV or query JSON, the review and comparison periods, cost basis, scope, currency, and the decision you need to make. Add Advisor recommendations, utilization, ownership, commitments, and operating constraints when available. Ask for a full review or a challenge to a proposed action. The skill reconciles the evidence, prioritizes bounded actions, rejects unsupported savings claims, and returns a verification plan without mutating Azure.
A Cost Management export, query result, invoice breakdown, or bounded table with period, scope, cost basis, and currency.
The cost question, comparison period, operational constraints, target scope, and approval boundary. Unknowns can remain explicit.
Required only for the bundled offline CSV and Cost Management JSON summarizer. No third-party packages or Azure credentials are needed.
SKILL.md; Azure cost export summarizer; evidence and savings review rubric; decision-ready report template; Agent Skills interface metadata
No reviews yet.
Output
A finding-by-finding review that labels $3,800 as vendor-estimated, rejects average CPU as sufficient sizing evidence, identifies peak, memory, dependency, and rollback gaps, and returns a safe pilot with service guardrails and a comparable post-change cost window.
Input
The team wants a three-year Azure reservation for a database fleet because the portal shows 45% potential savings. Usage has grown for four months, but one product migration may retire half the fleet next quarter. Produce an approval memo.
Output
A commitment review that separates gross discount from net savings, tests coverage and utilization against the migration scenario, records exchange and term unknowns, compares wait, shorter, and partial-coverage options, and ends with validate first or do not proceed plus the evidence that would reopen approval.
Creator
Zziravo